1.安裝前對(duì)準(zhǔn)備工作的檢查
1. Check the preparation before installation
在安裝前,
MNS低壓抽屜柜監(jiān)理工程師及甲方工程師要檢查進(jìn)場(chǎng)道路是否暢通,必要時(shí)要求要求總包單位修建簡(jiǎn)易運(yùn)輸通道與各安裝點(diǎn)連接,施工場(chǎng)地布置應(yīng)滿(mǎn)足文明施工的要求。同時(shí)還應(yīng)檢查安裝單位的施工機(jī)具安排狀況,督促安裝單位對(duì)施工機(jī)具進(jìn)行檢查,確保狀態(tài)良好。壓設(shè)備到達(dá)現(xiàn)場(chǎng)前,配電室、地溝、基礎(chǔ)槽鋼應(yīng)已完全竣工
Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
1)、配電室
1) . distribution room
配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細(xì)圖紙交予施工方(合同簽訂后2周內(nèi),重 點(diǎn)要落實(shí)客戶(hù)對(duì)圖紙的位置、內(nèi)容、完成時(shí)間確認(rèn)),并且在配電室建設(shè)過(guò)程中,我方或協(xié)作單位的技術(shù)人員要在現(xiàn)場(chǎng)監(jiān)督,避免施工錯(cuò)誤。(配電室建設(shè)大約需2周左右)
Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預(yù)留的設(shè)備風(fēng)道相對(duì)應(yīng),設(shè)備離墻的小距離要明確(距離太近,設(shè)備的柜門(mén)打不開(kāi))。(槽鋼焊接大約需2天,我方技術(shù)人員必須到場(chǎng)指導(dǎo))
2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
設(shè)備到達(dá)現(xiàn)場(chǎng):
Equipment arrival at site:
3)、若配電室、地基若未建好,低壓配電柜設(shè)備要有存放位置(要防雨或提供必要的防雨材料)。
3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
2.安裝
2. Installation
2.1各配電房門(mén)窗須嚴(yán)密,低壓配電柜房?jī)?nèi)清潔。
2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://www.zfzf6.com .